Projects

1. WAMAX WATER & ENVIRONMENT CO

 

Requirement

 

1.2 MLD Borwell And 2.4 MLD Contact Water Treatment in Mining Industry

Scope of Work

Process Engineering, Mechanical Engineering, 3D Modelling, Piping GA & Isometric, Project Management and Procurement Assistance

Activity & Unit Operations

 

Borwell Water
  • Flash Mixer, Flocculator, & HRSCC
  • Media Filtration
  • Ti2 X 50% Reverse Osmosis (RO) System
Contact Water
  • 2 Stage TPI
  • 2 x 50% Media Filtration
  • 2 X 50% Reverse Osmosis (RO) System
Sludge Treatment
  • Sludge Thickener
  • Decanter Centrifuge

2. MEGA EPC Projects Private Limited

 

Requirement

 

Process Condensate Treatment & Recycling for Grain- based, and Molasses based Distillery – 500 KLD, 550 KLD & 650 KLD

Scope of Work

Process Engineering

Activity & Unit Operations

 

  • pH Correction & Primary Treatment
  • Anaerobic Digester
  • Aeration Tank and Secondary Clarifier
  • Media Filtration
  • Ultrafiltration System
  • Reverse Osmosis (RO) System

3. Pan Gulf Technologies P Ltd

 

Requirement

 

Feed Engineering / feasibility Study for Membrane Brine Concentration (MBC) Unit and Bromine recovery from the Sea Water Desalination Plant Reject of feed capacity 330 MLD

Scope of Work

Process Engineering

Activity & Unit Operations

 

  • MBC Unit
  • 2 x 50% Clarifier
  • Crystalliser
  • Storage Tanks
  • Bromine Recovery System

4. Praj Industries Ltd

 

Requirement

 

500 KLD & 1 MLD Effluent Treatment system and Recycling using conventional biological process and UF-RO for Chemical Industries (Fertiliser & Rubber Industries) for Gujarat Location

Scope of Work

Process Engineering

Activity & Unit Operations

 

  • Effluent Segregation based on COD & TDS
  • Primary treatment System
  • Secondary conventional Activate Sludge Process
  • Media Filtration
  • Ultrafiltration System
  • Reverse Osmosis (RO) System

5. Praj Industries Ltd

 

Requirement

 

704 KLD WTP, 7.4 MLD ETP, Recycling & ZLD for Gujarat Location

Scope of Work

Process Engineering

Activity & Unit Operations

 

  • Pressure Drop Calculations across each Node in Water, Wastewater, Recycling & ZLD systems

6. Gradiant India Pvt Ltd

 

ween techsol

Requirement

 

2.3 MLD Sea Water Desalination for Industrial Application for Sri Lanka Location

Scope of Work

Process Engineering comprising Basic Engineering, Preparation of Bought out datasheets, and Vendor Evaluation, Mechanical Engineering including Vendor GA Evaluation, 3D Modelling, Piping GA & Isometric, Skid Isometric,
Piping BOQ

Activity & Unit Operations

 

  • Primary Treatment using Tube Settler for Suspended Solid removal
  • Dual Media Filtration
  • 2 x 50% Ultrafiltration System
  • 2 x 50% Reverse Osmosis (SWRO) System
  • 2 x 50% Reverse Osmosis (BWRO) System
  • 2 x 50% Demin Plant (Mixed Bed)

7. PD Consulting Engineers Pvt Ltd

 

Requirement

 

26 MLD Raw Water Treatment for City Water Supply for Chhatrapati Sambhaji Nagar, Maharashtra

Scope of Work

Process Engineering comprising Hydraulics calculations to Bought out GA Evaluation, Mechanical Engineering including Piping GA & Isometric, Piping BOQ

Activity & Unit Operations

 

  • Aeration Fountain
  • Primary system with Flash Mixer and Clariflocculator
  • Rapid Gravity Sand Filters (RGF)
  • Chlorination

8. TATA Motors Limited, Pune

 

Requirement

WWTP – 5 MLD, Hydro-Pneumatic System – 6 MLD

Activity & Unit Operations

  • ETP & STP Revamping
  • Lake Water Pumping
  • Ultrafiltration System
  • Reverse Osmosis System

Scope of Work

Wastewater Treatment
  • Study the existing system
  • Improvise the systems
  • Design recycling system
  • Prepare specifications
  • Formulate a tender for complete scope including Operation & Maintenance.
  • Evaluate the bidders and technically clear the bids.
Piping
  • Pipe Sizing
  • Pipe Routing for Process and Domestic applications
  • Preparation of complete BOQ.
  • Tender Preparation comprising above with specifications
  • Bids Evaluation

9. TATA Motors Limited, Jamshedpur

 

We are fortunate to be a part of TML initiative Project for Water Neutrality, comprising a vision for a greener, cleaner, and more sustainable future to maximizing Effluent Recycling.

Requirement

5 MLD WWTP, 1.6 MLD STP, 23 MLD WTP

Activity & Unit Operations

  • ETP Revamping
  • SBR system for STP
  • Ultrafiltration System
  • Reverse Osmosis System

Scope of Work

Wastewater Treatment
  • Study the existing system
  • Improvise the systems,
  • Design recycling system
  • Prepare specifications
  • Formulate a tender for complete scope including Operation & Maintenance.
  • Evaluate the bidders and technically clear the bids
Piping
  • Pipe Sizing
  • Pipe Routing for Process and Domestic applications
  • Preparation of complete BOQ
  • Tender Preparation comprising above with specifications
  • Bids Evaluation

10. SEA WATER DESALINATION

 

One of our customers required Process, Mechanical and Electrical & Instrumentation Engineering for their prestigious project. We supported the client from Water Balance Diagram, Dosing system design, Designing of the complete
system to 3D modelling, Preparation of GA’s, Complete Electrical & Instrumentation Engineering.

seawater desalination plant by WEEN

Requirement

 

12 MLD Sea Water Desalination plant

Scope of Work

 

  • Process Engineering
  • Mechanical Engineering
  • Electrical Engineering
  • Instrumentation Engineering

Activity & Unit Operations

 

  • Screening
  • 4 x 33% Zeolite Media Filters
  • 3 x 50% RO Cartridge Filters
  • 3 x 50% Sea Water Reverse Osmosis (SWRO) Systems
  • 3 x 50% Brackish Water Reverse Osmosis (BWRO) Systems
  • Drain Transfer systems
  • Pre-Chlorination Dosing system
  • Post-Chlorination Dosing system

11. SEA WATER DESALINATION in UAE

 

Repeat order from our esteemed customers required Process & Mechanical Engineering for their Oil & Gas Industry project in UAE. We are supporting the client from Water balance diagram, Dosing system design, Designing of the complete
system to 3D modelling, Preparation of GA’s, and Piping Isometric, Skid & Pipe rack stress Analysis. The essence of the Project is its stringent delivery timelines & specifications.

Requirement

 

4 MLD Sea Water Desalination plant in Abu Dhabi, UAE

Scope of Work

 

  • Process Engineering
  • Mechanical Engineering

Activity & Unit Operations

  • 1 x 100% Primary system comprising Flash mixer, Flocculator & Dissolved Air Floatation (DAF)
  • 2 x 100% Ultrafiltration system
  • 2 x 100% Reverse Osmosis (SWRO) Systems
  • 2 x 100% Reverse Osmosis (BWRO) Systems

Need a solution ?

Our experts can help.

Your back office for
Engineering & Consultancy Solutions

Our goal is to become the most trusted Consultancy & Engineering Organization globally, offering sustainable Water and Wastewater Engineering Solutions to our valued clients. From Proposal Support to Detail Engineering, we fulfil the complete requirement of Process & Mechanical for our customers. By providing innovative, eco-friendly practices, we strive to make a positive impact on the environment and contribute to a cleaner future.

About US

At WEEN, we provide top-tier engineering and consultancy services in Water and Wastewater Treatment.Since our founding in 2020, we have quickly emerged as one of the fastest-growing companies in the industry, committed to delivering innovative and sustainable solutions

amit@weentech.in

+91 956 109 1317